Browse Product Lines
Start with a front or rear wheel hub assembly and identify the flange, pilot and sensor interface before requesting quotes.
Open catalogILJIN Procurement coordinates supplier comparison, samples and inspection for China sourcing projects. The supplier remains responsible for the part and its evidence.
Start with a front or rear wheel hub assembly and identify the flange, pilot and sensor interface before requesting quotes.
Open catalogSend the vehicle application, OE cross reference, drawing revision and quantities to compare options against one scope.
Start an RFQRecord platform, axle position, hub flange dimensions and ABS encoder type. Put unresolved dimensions in a separate column so a partial quote can be identified.
Ask each source for the same quantities, sample terms, pack contents, named Incoterm and price validity. A stocked reference and a custom assembly have different evidence and release requirements.
Record which drawing revision the sample represents. Arrange a third-party inspection if requested and agree beforehand which dimensions, runout readings and interface checks belong in the scope.
Reconcile SKU labels, carton counts and lot references with the packing list. Confirm consignee details and hand the checklist to the appointed forwarder before consolidation.
Map the quoted reference to the supplier’s legal entity, manufacturing site, revision and declared scope. Record unresolved aliases or subcontracted operations.
Separate flange and pilot dimensions from magnetic encoder orientation and connector details. Use the buyer’s acceptance criteria for each observation.
Match issuer, scope, date, site and document identifier to the requirement. A management-system record belongs in a different field from a SKU test report.
Use the same named place and Incoterm for comparing landed-cost inputs. Record the quoted term and exclusions separately when a supplier offers a different basis.
List per-carton quantity, protective inserts and label revision for each SKU. The buyer approves the pack configuration before a mixed order is arranged.
Record open deviations and buyer disposition. One source can simplify revision control. Multiple sources can widen coverage if each source has its own approval and lot tracking.
Send the application and destination early. A complete brief helps separate a price difference from an interface, packing or delivery-term difference.